Engineered with excellence
Making the difference in building excellence.
Meyer Brothers Building Company was the Design/Build General Contractor of this turnkey project.
The building structure consists of a pre-engineered steel structure with a concrete/metal stud composite wall system.
The roof system is a Butler MR-24 standing seam metal roof. The canopy roof system is an architectural standing seam also furnished by Butler Manufacturing.
The office space of 1,600 SF consists of ground floor and a second
story mezzanine.
Project details
| Square Footage | 10,000 S.F. |
| Location | 1300 Douglas St. | Lee’s Summit, MO 64086 |
| End Use | Rental Facility |
| Completion Date | October 1998 |
| Architectural Features | Pre-engineered steel | Compsite wall system | MR-24 Standing seam metal roof. |
| Owner/Reference | To protect our clients privacy, please contact us for development reference information. |
| Architect | Davidson Design Group |

